【变更公告】有限深圳开平11-4油田18-1区块开发项目流动安全保障分析校核服务(二次)公开招标变更公告

发布时间 2026-03-02 项目编号 登陆后可查看
招标单位 登陆后可查看 招标联系人电话 登陆后可查看
代理机构 登陆后可查看 代理联系人电话 登陆后可查看

平11-4田18-1务(次)

标/
2026年03月03日 09时00
标/
2026年03月06日 09时00
平11-4田18-1务(次)
平11-4田18-1务(次)
KP11-4田18-1约500盖1d/1dSa/3和2d/5型FPSO中1d/1dSa/3署18和2留2;2d/5署11留2型FPSO。FPSO座150台7600kW至1d
广省/
统,台,
1. 平11-4田18-1务(次)
2026年02月11
:1。2析CO2、CO2。3少2。4)CCS或CCUS下CCS或CCUS少2个CCUS或CCS。 Flow Assurance Calculation Services for High-Pour-Point Oil & Gas Fields and High-CO2 Reinjection Systems shall include at least the following: Flow Assurance Analysis for Production System: Steady-state and transient simulation analysis of production fluids shall be performed, focusing on the evaluation of flow risks including hydrate formation, wax deposition, corrosion and erosion, slugging, asphaltene precipitation, emulsification, and foaming. Analysis shall also cover typical operational scenarios such as well start-up, shutdown, restart, and pigging. Deliverables shall include a simulation report and corresponding operational guidelines. Dedicated Analysis for High-CO2 Associated Gas Reinjection System: Steady-state and transient simulations of the reinjection system shall be conducted, including phase behavior modeling. Key analysis shall focus on CO? phase changes, the impact of CO2 purity on hydrate and dry ice formation risks, and simulation of key operational scenarios such as system start-up, shutdown, blowdown, and restart. Deliverables shall include a simulation report and corresponding operational guidelines. Case Study Summary for High-Pour-Point Oil & Gas Fields: A dedicated summary report on offshore high-pour-point oil and gas field development projects domestically and internationally shall be provided. The report shall cover flow assurance strategies and engineering challenges from at least two comparable projects. Case Study Summary for CCS/CCUS Projects: A dedicated summary report on subsea Carbon Capture, Utilization, and Storage (CCUS) or Carbon Capture and Storage (CCS) projects domestically and internationally shall be provided. The report shall cover flow assurance strategies and engineering challenges from at least two CCUS or CCS projects.
期/期/
为3
:1。2析CO2、CO2
100%
(1(2(3(4。Business License:(1) If the bidder is a company registered in China:The bidder must possess valid and lawful Business License, Tax Registration Certificate and Organization Code Certificate,?or?a unified Business License with a social credit code. Scanned copies of the original documents must be provided with the bid (the originals are to be available for inspection if required).If the bidder is an institution, it shall possess a valid and lawful Institution Legal Person Certificate. A scanned copy of the original certificate must be provided with the bid (the original is to be available for inspection if required).If the bidder is a Branch Company, it must provide a valid and lawful Business License along with a Letter of Authorization from its Corporate Head Office authorizing the branch to participate in this bid. The qualifications and performance of both this specific Branch Company and its Corporate Head Office will be recognized; however, the qualifications and performance of other branch companies under the same Corporate Head Office will?not?be recognized. Scanned copies of the original documents must be provided with the bid (the originals are to be available for inspection if required). Only?either?the Branch Company?or?its Corporate Head Office is permitted to participate in this bid. Submission of bids by both will result in the rejection of?both?bids.(2) If the bidder is a company registered outside China:The bidder must provide a valid company registration certificate issued by the relevant authorities in its country/region of incorporation.(3) Consortium Bidding Accepted: No.(4) Subcontracting Accepted: No.
2026年02月11至 2026年02月24
(https://bid.cnooc.com.cn/home/#/navigation线线退
200.00
2026年03月06日 09时00
线
线
2026年03月06日 09时00
:****** 登陆后可查看
:****** 登陆后可查看
:****** 登陆后可查看
:****** 登陆后可查看


市·区·街 6
:****** 登陆后可查看
:518000
:****** 登陆后可查看
平11-4田18-1务(次)-法.pdf &nbsp &nbsp

平11-4田18-1

平11-4田18-1务(次)
平11-4田18-1务(次)
KP11-4田18-1约500盖1d/1dSa/3和2d/5型FPSO中1d/1dSa/3署18和2留2;2d/5署11留2型FPSO。FPSO座150台7600kW至1d
广省/
统,台,
1. 平11-4田18-1务(次)
2026年02月11
:1。2析CO2、CO2。3少2。4)CCS或CCUS下CCS或CCUS少2个CCUS或CCS。 Flow Assurance Calculation Services for High-Pour-Point Oil & Gas Fields and High-CO2 Reinjection Systems shall include at least the following: Flow Assurance Analysis for Production System: Steady-state and transient simulation analysis of production fluids shall be performed, focusing on the evaluation of flow risks including hydrate formation, wax deposition, corrosion and erosion, slugging, asphaltene precipitation, emulsification, and foaming. Analysis shall also cover typical operational scenarios such as well start-up, shutdown, restart, and pigging. Deliverables shall include a simulation report and corresponding operational guidelines. Dedicated Analysis for High-CO2 Associated Gas Reinjection System: Steady-state and transient simulations of the reinjection system shall be conducted, including phase behavior modeling. Key analysis shall focus on CO? phase changes, the impact of CO2 purity on hydrate and dry ice formation risks, and simulation of key operational scenarios such as system start-up, shutdown, blowdown, and restart. Deliverables shall include a simulation report and corresponding operational guidelines. Case Study Summary for High-Pour-Point Oil & Gas Fields: A dedicated summary report on offshore high-pour-point oil and gas field development projects domestically and internationally shall be provided. The report shall cover flow assurance strategies and engineering challenges from at least two comparable projects. Case Study Summary for CCS/CCUS Projects: A dedicated summary report on subsea Carbon Capture, Utilization, and Storage (CCUS) or Carbon Capture and Storage (CCS) projects domestically and internationally shall be provided. The report shall cover flow assurance strategies and engineering challenges from at least two CCUS or CCS projects.
期/期/
为3
:1。2析CO2、CO2
100%
(1(2(3(4。Business License:(1) If the bidder is a company registered in China:The bidder must possess valid and lawful Business License, Tax Registration Certificate and Organization Code Certificate,?or?a unified Business License with a social credit code. Scanned copies of the original documents must be provided with the bid (the originals are to be available for inspection if required).If the bidder is an institution, it shall possess a valid and lawful Institution Legal Person Certificate. A scanned copy of the original certificate must be provided with the bid (the original is to be available for inspection if required).If the bidder is a Branch Company, it must provide a valid and lawful Business License along with a Letter of Authorization from its Corporate Head Office authorizing the branch to participate in this bid. The qualifications and performance of both this specific Branch Company and its Corporate Head Office will be recognized; however, the qualifications and performance of other branch companies under the same Corporate Head Office will?not?be recognized. Scanned copies of the original documents must be provided with the bid (the originals are to be available for inspection if required). Only?either?the Branch Company?or?its Corporate Head Office is permitted to participate in this bid. Submission of bids by both will result in the rejection of?both?bids.(2) If the bidder is a company registered outside China:The bidder must provide a valid company registration certificate issued by the relevant authorities in its country/region of incorporation.(3) Consortium Bidding Accepted: No.(4) Subcontracting Accepted: No.
2026年02月11至 2026年02月24
(https://bid.cnooc.com.cn/home/#/navigation线线退
200
2026年03月03日 09时00
线
线
2026年03月03日 09时00
市·区·街 6
:****** 登陆后可查看
:518000
:****** 登陆后可查看
:****** 登陆后可查看
:****** 登陆后可查看
击“书”

招标搜索热词